US30 Bridge Work Update: New lane restrictions

May 29, 2024 09:32 AM
 

Starting on June 10, 2024, bridge deck overlay will begin.

US 30 over Hart Ditch Bridge: There will be only one lane in each direction. The eastbound (EB) lane on US 30 will reduce to one lane (right lane) at Lake St., and the westbound (WB) lane will reduce to one lane (right lane) just west of Clark Rd. in Dyer, Indiana, and transition into the Left Lane closures on EB and WB US-30 between Lake Street and Keilman St.

A truck route for the 11-foot width limit will be as follows:
• Eastbound (EB) US 30 to Northbound (NB) 394 to Eastbound (EB) 80/94 to Southbound (SB) US 41 to Eastbound (EB) US 30.
• Westbound (WB) US 30 to Northbound (NB) US 41 to Westbound (WB) 80/94 to Southbound (SB) 394 to Westbound (WB) US 30.

Back to news